Real jobs, real customers, real numbers — not composite examples.
A full twin-wall flue system built from scratch in a smoke control area, fully compliant with DEFRA and building regulations.
4 months without hot water, resolved in 2 days — a job other companies had turned down.
An emergency call-out after a failed immersion heater tapping, resolved within 12 hours.
A home office measured at 42°C dropped to under 30°C with film alone, then to 16–18°C with AC added.
One discreet unit solved summer cooling, winter heating, and aesthetics in a loft conversion.
Supplied, fitted and commissioned within 48 hours, after 6 months stuck in a developer dispute.
Enter your details below and we'll unlock it straight away.
We'll only use this to send your guide and occasional tips — unsubscribe anytime. See our privacy policy.
Something went wrong — please try again, or call 01423 411 133.